Coeur d’Alene Resort
Event Center, CDA
Resort Golf Course

Hired by Clark Construction to install curbs, sidewalks, vehicle ramp to the pool and a “facelift” overlay on the sidewalk to the clubhouse.

 


Ferris High School
CR joins team of contractors under Garco Construction to construct sidewalks, site stairs, integral color architectural concrete, and concrete paving.


Dwight Merkel Skate Court
Cameron-Reilly prime contractor
on the project. Architectural retaining walls, concave/convex skate features
and bowl, hard-trowel surface finish.
Also build BMX starter hill under the same contract.

Project winner of the 2010 AGC Build NW Awards “Small Projects”


Coeur d' alene
Casino Expansion

CR hired by HFLK Venture to install 70,000 square feet of decorative sidewalks and traffic paving areas, containing color concrete, with sandwash finish and saw-cut joints. Parking lot curb was designed with
a custom built, mitred edge.

 


Library Road Phase 3
in Pullman, WA

is the largest subcontract in our company history. Being the main pedestrian thoroughfare through campus, the expectations were
set high. The project is laden
with architectural retaining walls, heated/lighted stairs, sidewalks,
and reinforced paving.