![]() |
Coeur d’Alene Resort Event Center, CDA Resort Golf Course Hired by Clark Construction to install curbs, sidewalks, vehicle ramp to the pool and a “facelift” overlay on the sidewalk to the clubhouse.
|
![]() |
Ferris High School |
![]() |
Dwight Merkel Skate Court Cameron-Reilly prime contractor on the project. Architectural retaining walls, concave/convex skate features and bowl, hard-trowel surface finish. Also build BMX starter hill under the same contract. Project winner of the 2010 AGC Build NW Awards “Small Projects” |
![]() |
Coeur d' alene Casino Expansion CR hired by HFLK Venture to install 70,000 square feet of decorative sidewalks and traffic paving areas, containing color concrete, with sandwash finish and saw-cut joints. Parking lot curb was designed with a custom built, mitred edge.
|
![]() |
Library Road Phase 3 in Pullman, WA is the largest subcontract in our company history. Being the main pedestrian thoroughfare through campus, the expectations were set high. The project is laden with architectural retaining walls, heated/lighted stairs, sidewalks, and reinforced paving. |
OTHER
PROJECTS:
• PUBLIC WORKS
• COMMERCIAL
• SUCCESSFUL
PROJECT ARCHIVE